click for accessibility tool

This site uses cookies to improve your experience.

We use cookies to offer you better browsing experience. Cookies enhance site navigation, analyze site usage, and assist in our marketing efforts.To understand more about how we use cookies or to change your cookie preferences, visit our privacy and cookies page or click on ‘Show settings’. By clicking ‘Accept all Cookies,’ you agree to the storing of cookies on your device.

Privacy Policy Centre

When you visit any website, it may store or retrieve information on your browser, mostly in the form of cookies. This information might be about your preferences or your device and is mostly used to make the site work as you expect it to. The information does not usually directly identify you, but it can give you a more personalized web experience.

Because we respect your right to privacy, below you will find descriptions on the types of cookies used on this site and options to opt out where preferred. Please note blocking some types of cookies may impact your experience of the site and the services we are able to offer.

These cookies are necessary for the website to function and cannot be switched off in our systems. They are usually only set in response to actions made by you which amount to a request for services, such as setting your privacy preferences, logging in or filling in forms.

You can set your browser to block or alert you about these cookies, but some parts of the site will not then work. These cookies do not store any personally identifiable information.

These cookies allow us to count visits and traffic sources so we can measure and improve the performance of our site. They help us to know which pages are the most and least popular and see how visitors move around the site.
All information these cookies collect is aggregated and therefore anonymous. If you do not allow these cookies we will not know when you have visited our site, and will not be able to monitor its performance.

These cookies allow us to count visits and traffic sources so we can measure and improve the performance of our site. They help us to know which pages are the most and least popular and see how visitors move around the site.
All information these cookies collect is aggregated and therefore anonymous. If you do not allow these cookies we will not know when you have visited our site, and will not be able to monitor its performance.

Privacy and cookies

SEGRO Park Berlin Airport, Melitta-Schiller-Straße 12-22, 12526, Berlin, Germany

Overview

SEGRO Park Berlin Airport consists of a logistics section with large-scale logistics units of around 72,500 square metres of lettable space and a light industrial section with flexible, small and medium-sized warehouse and office units with more than 85,000 square metres of lettable space. Further construction phases are already being planned.

The current construction phase 7 is being built according to modern standards for sustainable, ecological and energy-conscious construction. Wooden beams are being used in the warehouses, all areas are equipped with modern LED lighting and a PV system totalling 1 MWp is being installed on the roofs. A healthy ecosystem is also important to us. Generous species conservation areas will be created in the park. We are also aiming for DGNB Platinum certification.

SEGRO Park Berlin Airport is located in the immediate vicinity of the new Berlin-Brandenburg airport. The park is located directly on the B 96a and offers optimal access to the motorway network via the A 113 and A 117.

The rental units can be rented individually or together and allow for flexible growth at the site.

Accommodation

LIGHT INDUSTRIAL

PHASE 7 - Completion 12/2025

Future development with a total lettable space of 27,465 sq. m - All details in FACTSHEET.

 

PHASE 3 - available from February 2025

Unit Warehouse (sq.m) Office, 1st floor (sq.m) Service (sq.m) Total (sq.m)
J7 / 107 / 107

 

LOGISTICS

PHASE 3 - available from July 2024

Unit Warehouse (sq.m) Office (sq.m) Service (sq.m) Total (sq.m)
1 5,701 574 404 6,679

 

Future development - available from Q3 2025

Unit Warehouse (sq.m) Office (sq.m) Service (sq.m) Total (sq.m)
1 7,428 162 914 8,504
2 9,071 158 1,117 10,346

 

Specifications

LIGHT INDUSTRIAL

PHASE 7 (future development)

  • Warehouse height: Light Industrial: 6.5 m clear height Urban Logistics: 8.5 m clear height
  • Floor load: 5 t/sq m (Forklift trucks with a maximum total load of 5 t)
  • Each unit is equipped with 2 – 3 doors:
    • Ground-level gates:
      • Building V-Y: 3m W x 4.5m H
      • Building U: 5m W x 4.60m H
    • Additional loading ramps with loading door (3m W x 3.3m H) and electro-hydraulic dock leveller
  • Windows in the warehouse area
  • LED lighting
  • Skylights for optimum lighting conditions and ventilation
  • Energy-saving construction, DGNB Platinum certification targeted
  • Separate supply to each unit with district heating, water, green electricity for optimisation of ancillary costs
  • 63 A power backup for each unit; can be increased if necessary

PHASE 1-4

  • Warehouse height: 6 m clear height
  • Floor load: 5 t/sq m (forklifts with a maximum permitted load of 5 t/sq m)
  • Each unit is equipped with 2 doors:
    • Sectional door (3 m W x 4.2 m H), for ground-level access
    • Additional loading ramps with loading door (3 m x 3 m) and electro-hydraulic dock leveller
  • Windows in the warehouse area
  • LED lighting
  • Skylights for optimum lighting conditions and ventilation
  • Energy-saving construction, DGNB certified
  • Separate supply to each unit with district heating, water and electricity for optimisation of ancillary costs
  • 63 A power backup for each unit; can be increased if necessary

LOGISTICS

PHASE 3

  • Warehouse height: 10.5 m clear height
  • Windows: Aluminum windows with insulated glazing
  • Warehouse floor:
    - Storage area: Floor evenness according to DIN 18202, Table 3, Line 4
    - Picking area: Floor evenness according to DIN 18202, Table 3, Line 3
  • Floor load capacity: 50 kN/sqm
  • Lighting: LED equipment
    - Illuminance in the storage area: 200 lux
    - Illuminance in the picking area: 250 lux
  • Heating: up to 17°C in the warehouse (radiant tube heaters)
  • Fire protection: ESFR sprinkler system
  • Offices and social areas: high-quality equipped
  • Car parking spaces: 16

FUTURE DEVELOPMENT

  • Warehouse height: 12 m clear height
  • Warehouse floor:
    • Steel fiber concrete slab
    • Load capacity of 50 kN/sq m (5t) and point loads from shelf columns of 75 kN
  • Doors:
    • Sectional door (4 m W x 4.5 m H) for ground-level delivery
    • 18 electro-hydraulic dock levelers (Unit 1: 8 levelers, Unit 2: 10 levelers)
  • Windows: Aluminum windows with insulated glazing
  • Lighting: Intelligent LED lighting systems
  • Utilities:
    • Electricity and water connection per rental unit
    • Electrical protection per rental unit 63 A
    • Warehouse heating via VRF systems
    • Office heating via heat pump system
  • Sprinkler system FM Global
  • Office: 1 mezzanine office per rental unit (including sanitary facilities and driver registration)

SUSTAINABLE ASPECTS

LIGHT INDUSTRIAL 

  • Green roofs on office buildings
  • PV system with 1 MWp
  • E-charging stations for electric cars
  • Charging options for bicycles
  • BEG40 standard
  • Designated species protection areas
  • Rainwater storage tank for park irrigation
  • Aiming for DGNB Platinum certification

LOGISTICS

  • Green electricity supply through photovoltaic system
  • Charging stations for electric vehicles (20% of all car parking spaces)
  • Sustainable greening concept with green roofs
  • High-quality insulated building envelope (BEG 40)
  • Aiming for DGNB Platinum and DGNB Climate Positive certification

Location

SEGRO Park Berlin Airport is located in the immediate vicinity of the new capital city airport Berlin-Brandenburg. The park is located directly on the B 96a and offers optimal access to the motorway network via the A 113 and A 117.

DISTANCES

  • B96a = 700 m
  • Airport BER, Terminal 5 = 1.9 km
  • A113 = 2.5 km
  • A117 = 2.7km
  • Airport BER = 7.6 km
  • A10, ringroad Berlin = 12.5 km
  • Berlin city = 23 km
     

PUBLIC TRANSPORTATION

  • Train station “Grünbergallee” = 1.2 km
  • Bus stop “Am Seegraben” = 1.2 km
  • Bus stop “Seeweg” = 1.2 km
  • Train station “Airport BER, Terminal 5” = 2.6 km

Downloads

Factsheet Logistics Phase 3

PDF 4.3 MB

Factsheet Logistics (future development)

PDF 4.8 MB

Get in touch