SEGRO Park Le Thillay
Insight
- Recent business park located in the heart of the future A Park district
- In the immediate vicinity of Roissy CDG airport, 12 minutes from Le Bourget airport, and 30 minutes from Paris
- Excellent service with quick access to the A1 (Paris-Lille), A3 and A104
- More than 22,000 m², spread over 4 buildings with 4 cells each
Description
An ideal location and modular surfaces
SEGRO Park Le Thillay benefits from a privileged location, in the heart of the future A Park district comprising 195,000 m² of real estate developments on a 27-hectare site.
With a total area of 22,000 m², this new generation business park is made up of 4 independent and fully divisible buildings and is suitable for companies looking for mixed premises, in the immediate vicinity of Roissy-Charles-de-France airport. -Gaulle and the business and freight hub. Located less than 1 km from SEGRO Park Roissy and in the immediate vicinity of the D317 allowing you to reach the A1, A3 and A104 motorways in a few minutes, the site also benefits from the arrival of line 17, as part of the Grand East Express.
A new set, still expanding
Developed in 2 phases, the SEGRO Park Le Thillay is built according to the latest architectural and environmental standards: high quality architectural services, premises dedicated to the activity, offices on the ground floor and on the 1st floor, wooded areas and BREEAM environmental certification.
In particular, the A Park district provides for an integrated service center which will constitute an additional asset for the working environment of future users.
Phase 1 includes two buildings completed in 2021, with delivery of Phase 2 scheduled for 2022.
Aerial view of SEGRO Park Le Thillay at the heart of the future A Park
Technical characteristics
A fully modernized site offering an enclosed, secure and equipped space for a pleasant working environment.
Global characteristics
- High quality architectural service
- Lots made up of business premises and offices on the ground floor + R+1
- Metallic double skin cladding
- Metal frame
- Insulated steel tray cover
- LED lighting for common areas
- Tree-lined green spaces
- LV parking spaces
Logistic spaces
- Course depth including road: 32 m
- Heavy roads for maneuvering and circulation area
- Free height under frame: 8 m
- Concrete slab: 3 T / m²
- Level door (4 x 3 m): one per cell
- Dock door with leveler: one per cell
- Heating by gas unit heaters
- LED lighting
Offices
- Ground floor & R+1
- Painted walls, flooring
- Reversible climate control
- LED lighting
- Free height: 2.5 m under ceiling
- Technical standards RT 2012
- Delivered in open space
Building 1 – 5,234 m²
- 4,126 m² of warehouses / 1,108 m² of offices
Building 2 – 5,984 m²
- 4,876 m² of warehouses / 1,108 m² of offices
Building 3 – 5,232 m² (available at the end of phase 2)
- 4,124 m² of warehouses / 1,108 m² of offices
Building 4 – 5,232 m² (available at the end of phase 2)
- 4,124 m² of warehouses / 1,108 m² of offices