click for accessibility tool

This site uses cookies to improve your experience.

We use cookies to offer you better browsing experience. Cookies enhance site navigation, analyze site usage, and assist in our marketing efforts.To understand more about how we use cookies or to change your cookie preferences, visit our privacy and cookies page or click on ‘Show settings’. By clicking ‘Accept all Cookies,’ you agree to the storing of cookies on your device.

Privacy Policy Centre

When you visit any website, it may store or retrieve information on your browser, mostly in the form of cookies. This information might be about your preferences or your device and is mostly used to make the site work as you expect it to. The information does not usually directly identify you, but it can give you a more personalized web experience.

Because we respect your right to privacy, below you will find descriptions on the types of cookies used on this site and options to opt out where preferred. Please note blocking some types of cookies may impact your experience of the site and the services we are able to offer.

These cookies are necessary for the website to function and cannot be switched off in our systems. They are usually only set in response to actions made by you which amount to a request for services, such as setting your privacy preferences, logging in or filling in forms.

You can set your browser to block or alert you about these cookies, but some parts of the site will not then work. These cookies do not store any personally identifiable information.

These cookies allow us to count visits and traffic sources so we can measure and improve the performance of our site. They help us to know which pages are the most and least popular and see how visitors move around the site.
All information these cookies collect is aggregated and therefore anonymous. If you do not allow these cookies we will not know when you have visited our site, and will not be able to monitor its performance.

These cookies allow us to count visits and traffic sources so we can measure and improve the performance of our site. They help us to know which pages are the most and least popular and see how visitors move around the site.
All information these cookies collect is aggregated and therefore anonymous. If you do not allow these cookies we will not know when you have visited our site, and will not be able to monitor its performance.

Privacy and cookies

SEGRO Park Rainham

Explore this section

Overview

A PIONEERING DEVELOPMENT THAT PUSHES THE BOUNDARIES OF INDUSTRIAL SPACE IN EAST LONDON

Following on from the success of Phase One, Phase Two – SEGRO Park Rainham pushes boundaries in innovation and sustainability even further, maximising space for occupiers, improving cost efficiencies and promoting employee wellbeing.

SEGRO’s passion for progress is driven by a desire to put the modern customer’s needs first. The units are built with sustainability, longevity and productivity at the forefront, providing accommodation to satisfy a wide range of occupiers.

Above

The Passion Behind the Progress at Phase Two SEGRO Park Rainham

Innovations

SMART BUILDINGS
Unit 8 has a Tesla battery to store generated electricity. All other units are ‘plug & play’ ready for the technology to be installed.

Unit 9 features smart sensors to help improve operational efficiency.

BIODIVERSE ENVIRONMENT
Native flora and the introduction of four beehives enhance the environment, whilst boosting the natural habitat and improve wellbeing for customers.

WELLBEING FOCUS
An outside communal seating area and gym, and green/living walls in Units 9 & 10 help improve wellness for employees.

Unit 9 is ‘WELL’ ready, providing customers with the option to pursue ‘WELL’ certification.

MODERN INTERIORS
Contemporary interior finishes for all offices, facilities and entrance foyers.

SUSTAINABILITY
Each unit has an EPC A+ rating, is Carbon Neutral and targeting BREEAM ‘Excellent’, incorporating highly efficient sustainability measures built for the long term. These include photovoltaic panels, LED lighting and electric car charging points as standard.

Further enhancements include the use of translucent wall panelling to increase internal natural daylight and pre-installed ‘plug & play’ connections for batteries that store generated electricity.*

*Unit 8 incorporates battery storage, ‘plug & play’ available on other units.

Size & Specification

UNIT 6

LET 

  SQ FT SQ M
First floor office 4,372 406
Second floor plant 886 82
Warehouse 26,400 2,453
Total 31,658 2,941

UNIT 7

LET

  SQ FT SQ M
First floor office 5,069 471
Second floor plant 888 83
Warehouse 30,571 2,840
Total 36,528 3,394

UNIT 8

LET

Tesla battery will stores generated electricity to put back into the unit, reducing consumption and costs

  SQ FT SQ M
Warehouse 14,256 1,324
Office 2,030 189
Total 16,286 16,286

UNIT 9

AVAILABLE

Office space included above the loading doors to improve available warehouse space and productivity. Green/living wall. Designed to improve air quality and energy levels.

  SQ FT SQ M
Warehouse 9,611 893
Office 1,886 175
Total 11,497 1,068

UNIT 10

LET 

Green/living wall. Designed to improve air quality and energy levels.

  SQ FT SQ M
Warehouse 11,291 1,049
Office 2,030 189
Total 13,321 13,321

Typical Specifications

  • Suitable for classes: B1(c), B2 and B8
  • First floor offices with air conditioning
  • 10–12m eaves
  • Flexibility to install mezzanines and high bay racking
  • Smart building technology to drive efficiency and wellbeing
  • Dedicated and secure yards up to 35m
  • Cycle shelters and showers
  • 50 kN/m2 floor loading
  • Native flora and four beehives to boost natural habitat
  • Onsite security and 24/7 CCTV
  • Electric car charging points
  • Photovoltaic panels
  • LED lighting
Above

Green/living wall. Designed to improve air quality and energy levels.

Sustainability

With an EPC A+ rating, Carbon Neutrality standards and targeting BREEAM ‘Excellent’ standards, each unit incorporates highly efficient sustainability measures built for the long term.

These include maximised photovoltaic panels to all roofs and some walls, LED lighting and electric car charging points as standard.

Further enhancements include the use of translucent wall panelling to increase natural daylight and the installation of a Tesla battery on Unit 8, to store generated electricity. All other units are ‘plug & play’ ready for the technology to be installed.

Above

SEGRO Park Rainham

Virtual Tours

Phase One - SEGRO Park Rainham

A range of unit sizes allows for different fit-outs, racking combinations and suitability for a range of industries including manufacturing, logistics, food & beverage, trade and pharmaceutical.

Each unit incorporates innovative specifications including photovoltaic panels, LED lighting and electric car charging points.

  • Suitable for classes: B1(c), B2 and B8
  • First floor offices with air conditioning
  • 10–12m eaves
  • Flexibility to install mezzanines and high bay racking
  • Dedicated and secure yards
  • Semi-mature landscaped environment
  • Cycle shelters and showers
  • 50 kN/m2 floor loading
  • Level access loading doors to all units
  • Dock loading to units 1 & 2
  • Fenced & secure yards (units 1 & 2)
  • CCTV linked to 24/7 control centre
  • EPC rating A BREEAM ‘Excellent’
  • Translucent panels to warehouse walls and roof providing natural daylight
  • Solar walls providing additional heating to offices
  • Electric car charging points
  • Photovoltaic panels
  • LED lighting

Location

Located adjacent to the A13, with fast access to central London and the M25.

In the heart of a regeneration zone set to benefit from an influx of investment, SEGRO Park Rainham is perfectly positioned on the perimeter of the UK's largest market - with 46% of the UK's population within a 90 minute drive. With the Port of Tilbury and London Gateway only a short distance away, SEGRO Park Rainham is best placed to meet the demands of today's logistics businesses.

Drive Times

A13 0.5 miles 2 mins
Rainham Station (C2C) 0.9 miles 3 mins
A406 North Circular 5.2 miles 10 mins
M25 (Junction 31) 5.7 miles 9 mins
A12 5.9 miles 17 mins
London City Airport 8.5 miles 22 mins
M11 (Junction 4) 10.7 miles 23 mins
Port of Tilbury 12.9 miles 18 mins
Central London 15.5 miles 35 mins


Source: Google Maps

HGV Drive Times

Barking Intermodal Terminal 12 mins
Port of Tilbury 18 mins
London City Airport 22 mins
London Gateway Docks 41 mins
Stansted Airport 1hr 12 mins
Dover 2hr 8 mins

 

Rail Times

Beam Park Station (2020) Liverpool Street 20 mins
Rainham (C2C) to London Fenchurch Street 24 mins
Dagenham Heathway (District Line) to London Victoria 46 mins

 

Location

Downloads

Phase Two – SEGRO Park Rainham Brochure

PDF 3.3 MB

Phase Two – Fact Sheet

PDF 513.7 KB

Phase One – SEGRO Park Rainham Brochure

PDF 1.6 MB

Get in touch