Specifications Logistics centres 1-3
Tufsteen 1-3, Hoofddorp
| Tufsteen 1 | Tufsteen 2 | Tufsteen 3 |
Warehouse | 9.435 m² | 9.438 m² | 7.046 m² |
Office | 332 m² | 300 m² | 232 m² |
Mezzanine | 1.060 m² | 1.056 m² | 765 m² |
Total | 10.827 m² | 10.794 m² | 8.043 m² |
Parking (of which EV) | 84 (4) | 84 (0) | 62 (0) |
Parking trucks | 3 | 3 | 3 |
Docks per unit/total | 12 | 16 | 10 |
Year of construction | 2018 | 2020 | 2020 |
Overhead doors per unit | 2 |
Floor flatness warehouse | NEN2747, table 1 class 4 |
Floor load warehouse | 50kN/m² |
Floor load expedition area | 50kN/m² |
Rack post load | 90 kN |
Floor load mezzanine | 10 kN/m² |
Floor load office | 4 kN/m2 |
Free height warehouse | 12.2 m |
Free height under mezzanine | 4.8 m |
Warehouse temperature | 12 gr. C |
Sprinklersystem | ESFR |
Energy label | A |
Battery storage | Yes |
BREEAM certificate | Excellent |
Full electric / gasless | Yes |
Specifications Logistics centres 4-5
Barnsteen 1-2, Hoofddorp
| Tufsteen 1 |
Warehouse | 23.109 m² |
Office | 3.755 m² |
Mezzanine | 1.014 m² |
Total | 27.878 m² |
Parking (of which EV) | 233 (26) |
Parking trucks | 3 |
Year of completion | 2023 |
Docks per unit/totaal | 39 |
Overhead doors per unit | 5 |
Floor flatness warehouse | Super flat (DIN15185) |
Floor load warehouse | 50kN/m² |
Floor load expedition area | 50kN/m² |
Rack post load | 90 kN |
Floor load mezzanine | 10 kN/m² |
Floor load office | 4 kN/m2 |
Free height warehouse | 12.2 m |
Free height under mezzanine | 4.8 m |
Warehouse temperature | 15 gr. C |
Sprinklersystem | ESFR |
Energy label | A+++++ |
Battery storage | Yes |
BREEAM certificate | Excellent |
Full electric / gasless | Yes |