Specifications Logistics centres 1-3
Tufsteen 1-3, Hoofddorp
|
|
Tufsteen 1 |
Tufsteen 2 |
Tufsteen 3 |
|
Warehouse space |
9.435 m² |
9.438 m² |
7.046 m² |
|
Office space |
332 m² |
300 m² |
232 m² |
|
Mezzanine |
1.060 m² |
1.056 m² |
765 m² |
|
Total surface |
10.827 m² |
10.794 m² |
8.043 m² |
|
Parking spots cars (of which EV) |
84 (4) |
84 (0) |
62 (0) |
|
Parking spots trucks |
3 |
3 |
3 |
|
Docks per unit/total |
12 |
16 |
10 |
|
Year of completion |
2018 |
2020 |
2020 |
|
Overhead doors per unit |
2 |
|
Floor flatness warehouse |
NEN2747, table 1 class 4 |
|
Floor load warehouse |
50kN/m² |
|
Floor load expedition area |
50kN/m² |
|
Rack post load |
90 kN |
|
Floor load mezzanine |
10 kN/m² |
|
Floor load office |
4 kN/m2 |
|
Free height warehouse |
12.2 m |
|
Free height under mezzanine |
4.8 m |
|
Warehouse temperature |
12 gr. C |
|
Sprinklersystem |
ESFR |
|
Energy label |
A |
|
BREEAM certificate |
Excellent |
|
Full electric / gasless |
Yes |
Specifications Logistics centres 4-5
Barnsteen 1-2, Hoofddorp
|
|
Tufsteen 1 |
|
Warehouse space |
23.109 m² |
|
Office space |
3.755 m² |
|
Mezzanine |
1.014 m² |
|
Total surface |
27.878 m² |
|
Parking spots cars (of which EV) |
233 (26) |
|
Parking spots trucks |
3 |
|
Year of completion |
2023 |
|
Docks per unit/total |
39 |
|
Overhead doors per unit |
5 |
|
Floor flatness warehouse |
Super flat (DIN15185) |
|
Floor load warehouse |
50kN/m² |
|
Floor load expedition area |
50kN/m² |
|
Rack post load |
90 kN |
|
Floor load mezzanine |
10 kN/m² |
|
Floor load office |
4 kN/m2 |
|
Free height warehouse |
12.2 m |
|
Free height under mezzanine |
4.8 m |
|
Warehouse temperature |
15 gr. C |
|
Sprinklersystem |
ESFR |
|
Energy label |
A+++++ |
|
BREEAM certificate |
Excellent |
|
Full electric / gasless |
Yes |
|
Battery storage |
Yes |