SEGRO Logistics Centre Le Plessis-Pâté
Overview
- Logistics building located between the A6, N7 and N104 motorways, in the town of Plessis-Pâté
- 30 minutes from Orly Airport and 40 minutes from Paris
- Excellent transport links with quick access to the N104; close to the A6, the N7 and the N20 motorways
- One building of over approximately 50,000 m², divided into 8 cells.
Description
An interesting location in the south of the Paris region
The SEGRO Logistics Centre Le Plessis-Pâté is a latest-generation logistics building covering more than 50,000 m², in the heart of a former air base.
The former air base 217 located in the municipalities of Brétigny-sur-Orge and Le Plessis-Pâté has been the subject of a development carried out by local authorities and now hosts a mix of businesses (SMEs, e-commerce, events, etc.).
Set on a site covering nearly 10 hectares, the building enjoys an exceptional location, 35 km south of Paris, close to the Francilienne and A6 motorways and just a few minutes from the N7 and N20 roads. The proximity of Paris-Orly airport completes the site's prime location.
Performance, energy efficiency and pleasant working environment
Due for completion in early 2022, the SEGRO Logistics Centre Le Plessis-Pâté is a Class A asset comprising eight units and certified BREEAM Very Good. Fully enclosed, equipped with numerous facilities conducive to high logistics performance, as well as modern office space, it offers a pleasant working environment with its tree-lined green spaces.
An architectural service of very high quality, meeting the most recent requirement criteria.
Technical characteristics
Exterior Features
- Fully enclosed site
- Security guard post
- BREEAM “Very Good” certification
- 10 HGV waiting places
- 140 LV parking spaces
Activity
- Concrete structure
- Clear height under beams: 10 m
- Double skin cladding on the roof (ready for solar panel installation)
- 8 Cells of nearly 6,000 m²
- Concrete flooring: 5T / m²
- 44 loading bay doors (including 17 for the 3 cells available)
- Gas-fired air heaters
- LED lighting
- 48 dock doors
- 2 access ramps
- ICPE: 1510 - 1511 - 1530 - 2662 - 2663 - 2925
Offices
- 2 office areas of 750 m² each including staff rooms
- Floor load capacity: 350 kg/m²
- Tile flooring on the ground floor and carpet or PVC tiles on the first floor
- Suspended ceiling
- One disabled toilet per unit